Specification committee

Mission

The sLHC Specification Committee follows guidelines set out in the Finance Committee Document CERN/FC/4016, to carry out technical auditing of  Market Surveys and Invitations to Tender expected to exceed 200 000 CHF.

Members

Tadeusz Kurtyka (Chairperson) / DG-PRJ
Luz Lopez-Hernandez / GS-SEM
Sylvain Weisz / DG-PRJ
Pierre Bonnal / DG-PRJ
Anders Unnervik / FP-PI
François Angerand / DGS-SEE
François Duval / EN-EL
Mauro Nonis / EN-CV

Cécile Noels / DG-PRJ (Secretary)

Market surveys

The technical and commercial documents are circulated during two weeks among the SC members for comments. The comments are collected by the Chairperson and integrated, with the agreement of the technical person responsible for the MS, into the final version. Once approved by the Specification Committee, the documents are sent by the Purchasing Office to a selection of firms.

» List of Market Surveys reviewed by the Specification Committee

Reference Description Status
MS-3604/AB/LINAC4 Permanent Magnet Quadrupole for the LINAC4 Drift Tube Linac Sent 27/10/08
MS-3622/AN/LINAC4 Production and testing of 110kV, 5.5MW peak, 1.7ms/2Hz pulse transformers immersed in oil tanks Sent 15/12/08
MS-3623/TE/LINAC4 Design, production, testing and supply og High Voltage Fully Controllable Solid State Switch Assemblies Sent 22/01/09
MS-3614/BE/LINAC4 Medium Power Pulsed RF Amplifiers for Linac4 Sent 11/05/09
MS-3657/TE/LHCIRp1 Low carbon steel sheets for the superconducting magnets of the LHC IR Upgrade phase 1 Sent
08/07/09
MS-3698/BE/LINAC4 Ferrite RF Loads for Linac4 Sent
10/06/10
MS-3699/BE/LINAC4 Supply and Assembly of a Faraday Cage Sent
10/02/10
MS-3676/BE/LINAC4 Manufacturing of High Precision Tank Segments for the Linac4 Drift Tube Linac (DTL) Cancelled
MS-3715/BE/LINAC4 Supply of Linac4 RF wave-guide windows Sent
16/04/10
MS-3617/TE/LINAC4 LINAC4 Intertank and Transfer line Quadrupoles Sent
02/03/10
MS-3729/TE/ATLAS Two redundant helium compressor skids for the existing ATLAS magnet main refrigerator Sent
26/05/10
MS-3752/TE/LHC The Manufacture of Beam Screen Tubes for LHC Cryo-Magnets Sent
27/08/10
MS-3728/TE/LHC Waveform Digitizers for the Kicker Systems of the LHC Beam Dumping System Sent
30/08/10
MS-3679/EN Supply of power cables Sent
23/09/10
MS-3764/EN Static Uninterruptible Power Supplies (UPS) Systems for the Computer Centre Project Sent
01/10/10
MS-3773/EN Supply of Cast iron or Steel blocks for LHC-R2E project (phase 1 and 2) Sent
07/10/10
MS-3757/BE/LINAC4 Supply of klystron focalization power supplies 300Vdc 20A for Linac4 Sent
09/12/10
MS-3680/EN Power cables laying Sent
18/11/10
MS-3779/EN Supply of a Vehicle-Mounted Industrial Robot System for the Exchange of Radioactive ISOLDE Targets Sent
20/12/10
MS-3753/TE Beam vacuum All-Metal Gate Valves with and without RF Contacts Circulated
20/12/10

Invitations to tender

This list is frequently modified. Meetings take place in room 30/6-041.

» List of meetings

Meeting Date Invitation to Tender
11 April 2008 at 16.00 IT-3551/TS - Consultancy Services for Linac4
11 April 2008 at 16.00 IT-3552/TS - CE Works for Linac4
26 February 2009 at 14.00 IT-3622/TE/LINAC4 - Production and Testing of 110kV, 5.5MW peak, 1.7ms/2Hz pulse transformers immersed in oil tanks
3 September 2009 at 16.00 IT-3614/BE/LINAC4 - Medium Power Pulsed RF Amplifiers for Linac4
17 September 2009 at 14.00 IT-3613/TE/SPS - 60 kV, 300 mA Capacitor Charging Power Supplies for the SPS Vertical Beam Dumping Kicker System
17 September 2009 at 16.00 IT-3623/TE/LINAC4 - Design, Production, Testing and Supply of High Voltage Fully Controllable Solid State Switch Assemblies for Pulsed Power rated for 4.4kV, 1850 A peak, 2ms/2Hz.
5 November 2009 at 14.00 IT-3664/EN/IRp1 - Supply of a Quadrupole Collaring Press.
10 November 2009 at 14.00 IT-3668/BE/LINAC4 - Supply of 352MHz, 2.8MW peak Klystrons for Linac4.
7 January 2010 at 14.00 IT-3661/TE/LHC - Supply of helium transfer lines for the LHC liquid helium storage system.
12 March 2010 at 14.00 IT-3700/TE/LHC - Co-lamination of stainless steel strip for the manufacture of beam screens for LHC cryo-magnets.
8 April 2010 at 14.00 IT-3657/TE/IRp1 - Supply of Low-Carbon Steel Sheets for the Superconducting Magnets of the LHC IR Upgrade Phase 1.
8 April 2010 at 15.00 IT-3667/TE/LHC - Cooling tubes for the beam screens of LHC cryo-magnets.
27 April 2010 at 14.00 IT-3658/GS - PS Personnel safety system.
17 August 2010 at 14.30 IT-3733/EN - Supply, installation and commissioning of an electron beam welding machine.
16 September 2010 at 14.00 IT-3699/BE/LINAC4 - Supply and Assembly of a Faraday Cage.
12 October 2010 at 14.30 IT-3752/TE/LHC - Manufacture of beam screen tubes for LHC cryo-magnets.
20 October 2010 at 14.30 IT-3683/EN - Supply, Installation and Test of Optical Fibre Cabling Systems on the CERN domain.
21 October 2010 at 14.30 IT-3729/TE/ATLAS - Two redundant helium compressor skids for the existing ATLAS magnet Main Refrigerator.
22 October 2010 at 14.30 IT-3763/EN - Supply and installation of the demineralized water pumping station for Building 867.
28 October 2010 at 14.30 IT-3715/BE/LINAC4 - Supply of Linac4 RF wave-guide windows.
11 November 2010 at 9.30 IT-3774/TE - Detailed design and site supervision of a new industrial building on the CERN site.
23 November 2010 at 14.30 IT-3773/EN/LHC - Supply of Cast iron or Steel blocks for LHC-R2E project (phase 1 and 2).
24 November 2010 at 14.30 IT-3684/EN/ATLAS - Design, Construction, Installation and Commissioning of a Low Temperature Chiller.
3 December 2010 at 9.00 IT-3679/EN - Supply of power cables.
10 December 2010 at 9.00 IT-3731/EN - Modernization of 65t overhead travelling crane PR709 in SX2 (ALICE).
15 December 2010 at 14.30 IT-3680/EN - Power cables laying.